Environmental Compliance

Not Started
In Progress
Passed
PassedPlus
Bronze
Silver
Gold
Failed

Permits, Licenses, Statutory

Status: In Progress

BASIS OF ASSESSMENT: Work In Progress on the basis of a completion of an SLF Preliminary Assessment Visit, conducted on 23-11-2024.

EVIDENCE: Onsite visit conducted.

NEXT STEPS: Afritan will continue to work towards a formal audit with SLF - date to be determined.

EMS

Status: Not Started

Environmental Health & Safety

Status: In Progress

BASIS OF ASSESSMENT: Work In Progress on the basis of a completion of an SLF Preliminary Assessment Visit, conducted on 23-11-2024.

EVIDENCE: Onsite visit conducted.

NEXT STEPS: Afritan will continue to work towards a formal audit with SLF - date to be determined.

Environmental Footprint

Status: Not Started

Land use

Status: Not Started

Energy Consumption

Energy Consumption kWh/m2 of leather

100 kWh/m2
0 kWh/m2
Average from Tanned to Finished kWh/m2
Company’s actual consumption kWh/m2


Afritan Leather Annual Energy Consumption: kWh

Energy Consumption

Status: In Progress

BASIS OF ASSESSMENT: Work In Progress on the basis of a completion of an SLF Preliminary Assessment Visit, conducted on 23-11-2024.

EVIDENCE: Onsite visit conducted.

NEXT STEPS: Afritan will continue to work towards a formal audit with SLF - date to be determined.

Water Use

Water Use L/m2 of leather

100 L/m2
0 L/m2
Average from Tanned to Finished L/m2
Company’s actual consumption L/m2


Afritan Leather Annual Water Use: ML

Water Use

Status: In Progress

BASIS OF ASSESSMENT: Work In Progress on the basis of a completion of an SLF Preliminary Assessment Visit, conducted on 23-11-2024.

EVIDENCE: Onsite visit conducted.

NEXT STEPS: Afritan will continue to work towards a formal audit with SLF - date to be determined.

Raw Materials & Chemicals

Status: Not Started

Machinery & Equipment

Status: In Progress

BASIS OF ASSESSMENT: Work In Progress on the basis of a completion of an SLF Preliminary Assessment Visit, conducted on 23-11-2024.

EVIDENCE: Onsite visit conducted.

NEXT STEPS: Afritan will continue to work towards a formal audit with SLF - date to be determined.

Air Emissions

Discharge ParamenterRegulatory Limit mg/lActual DischargeCategory Band
Boilers (NOx)
Boilers (SO2)
Spray Machines - Particulates
Spray Machines - Nitrogen Oxide (NOx)
Spray Machines - Carbon Monoxide (CO)
Toggling - Nitrogen Oxide (NOx)
Toggling – Carbon Monoxide (CO)

Air Emissions

Status: Not Started

| | | ;

Effluent Treatment

Discharge ParameterRegulatory Limit mg/lActual Discharge mg/lCategory Band
Chemical Oxygen Demand (COD)
Biological Oxygen Demand (BOD)
Total Kjeldahl Nitrogen
Total Nitrogen
Ammonia Nitrogen
Suspended Solids
Oil & Grease
Chromium VI
Total Chromium
Dissolved Oxygen
Phoshorous
Phenol
pH Range
Sulphides
Chlorides
Synthetic Detergent Limit
Copper
Cyanide
Lead
Mercury
Nickel
Cadmium
Zinc
Sulphates
Total Dissolved Solids

Effluent Treatment

Status: In Progress

BASIS OF ASSESSMENT: Work In Progress on the basis of a completion of an SLF Preliminary Assessment Visit, conducted on 23-11-2024.

EVIDENCE: Onsite visit conducted.

NEXT STEPS: Afritan will continue to work towards a formal audit with SLF - date to be determined.

Soil Contamination

Status: Not Started

Solid Waste

Status: Not Started